Sorry I found no matches, Please try again. 176
vid = 30pws_id = 354306pws_id = 354306
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.225.56.194 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Batsworthy Cross Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Batsworthy Cross Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Batsworthy Cross Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Devon    
Type of installation: Wind    on/offshore: on
Turbines :9  Capacity : 18 MW
Approx Date of 1st power generation: August 2016

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Currently under construction

CBatsworthy Cross Wind Farm would make a valuable contribution towards Devons adopted target of installing 151MW of renewable energy capacity by 2010 - of which only 25MW is installed so far.

It is anticipated that construction of the wind farm will commence in spring 2015 and last for approximately 18 months

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Knowstone South Molton Devon EX36 4RZ England

 Associated Companies.

Relationship Company (For: Batsworthy Cross )
DeveloperRWE Innogy
OwnerRWE Innogy

 DECC Data on this Project: Batsworthy Cross :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Batsworthy Cross     18 MW
Energy Type: Wind Onshore
County: Devon     Country: England     LPA: North Devon District Council
Site ID and Reference: 4057 / N00425W     District:
Applicant: Blackrock Real Assets     Application : 43272 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 9 Turbine Capacity: 2
Height of Turbines: 103 Calculated capacity: 18
Site Address: Batsworthy Cross , Creacombe , North Devon
 
County: Devon Region: South West
OS Coordinates: 281500 / 281500
Development Status: Operational
Application Submitted: 11/18/2006 Planning Permission Granted
Application Determined: Permission refused: 7/20/2011
Construction Date: 1/18/2016    
Generator Live 4/7/2016 This Record Last Updated: 11/30/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 7/20/2011

 OFGEM Data on this Project: Batsworthy Cross: Wind :

Site Name: Batsworthy Cross Wind Farm
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00391RQEN
Capacity: 18265.5 Status: Live
Accreditation Date: 11/18/2006    
Commission Date: 4/7/2016    
Applicant: Batsworthy Cross Wind Farm Limited
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: Knowstone South Molton Devon EX36 4RZ England

Site Name: Batsworthy Cross Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G02923NWEN
Capacity: 18265.5 Status: Live
Accreditation Date: 11/18/2006    
Commission Date: 4/7/2016    
Applicant: Batsworthy Cross Wind Farm Limited
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: Knowstone South Molton Devon EX36 4RZ England
 
Assumptions: Capacity: 18265.5kW 18.2655 MW,
Thus over the month Capacity * 720 hours per month = 13151.16 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 3104 16.99% Issued
01/03/2018 3892 21.31% Issued
01/02/2018 3801 20.81% Issued
01/01/2018 5629 30.82% Issued
01/12/2017 3567 19.53% Issued
01/11/2017 2527 13.83% Issued
01/10/2017 3507 19.20% Issued
01/09/2017 2713 14.85% Issued
01/08/2017 1908 10.45% Issued
01/07/2017 2017 11.04% Issued
01/06/2017 2670 14.62% Issued
01/05/2017 2387 13.07% Issued
01/04/2017 1731 9.48% Issued
01/03/2017 4591 25.13% Issued
01/02/2017 4020 22.01% Redeemed
01/01/2017 3582 19.61% Redeemed
Dec-16 02167 2408 13.18% Issued
Nov-16 02749 3055 16.73% Issued
Oct-16 01988 2209 12.09% Issued
Sep-16 01940 2156 11.80% Issued
Aug-16 02036 2262 12.38% Issued
Jul-16 01059 1184 6.48% Issued
Jun-16 0871 977 5.35% Issued
May-16 01249 1387 7.59% Issued
Apr-16 0420 470 2.57% Issued

 Calculations


Capacity: 36
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/16/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 36 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 354306

Project Info
BATSWORTHY CROSS - Digital Geography

RWE Innogy

Two Moors Campaign

RWE takes wing at BATSWORTHY CROSS
(April 2015) RWE Innogy UK will kick off construction of the 18MW BATSWORTHY CROSS wind farm in north Devon next month.

Public Inquiry into BATSWORTHY CROSS wind farm
The planning application (43272) for the wind turbine development on land at BATSWORTHY CROSS, Knowstone, South Molton was originally refused planning permission by North Devon Council's Planning Committee in June 2011.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School